Permits

Stephen Avenue is in the heart of our city and home to Calgary’s finest collection of heritage buildings. Permits are required for all activations on the Avenue, from 1 Street SE to 3 Street SW. Please note that permits require 7-10 business days to process and are subject to applicable fees. Permit requests for dates within 7 business days are subject to rush fees. Activations on Stephen Avenue must be safe and inclusive for all.

If you have any questions or concerns, please contact: permits@downtowncalgary.com. 

For all other permits, please visit the City of Calgary's online portal.

Vehicle Access Permit

Stephen Avenue is closed 24/7 to vehicle traffic from April 1 to Oct 31 and closed to vehicle traffic from 6 am to 6 pm the rest of the year. A vehicle access permit is required to drive on Stephen Avenue during these road closures. This applies to delivery, events, and construction vehicles. Please allow 7-10 business days for permit processing.

Stephen Avenue does NOT include the Olympic Plaza/Burns Building Block (200 8th Ave SE). Contact 3-1-1, or 403-268-2489 if you are outside Calgary, to request permits for this block. Back-alley access/loading docks do not require a permit.

  • The Vehicle Access permit allows for parking up to 20 minutes on the Avenue for pick-up/drop-off purposes only.

  • It does not generally allow driving on the Avenue between the hours of 11:00AM - 2:00PM due to high pedestrian traffic.

  • The permit is NOT valid during City of Calgary snow removal.

 

Construction Permit

All construction work that occurs on or is staged from Stephen Avenue or Barclay Parade requires a permit.

  • Applications MUST be submitted a minimum of four (4) weeks prior to the commencement of work or the permit will be subject to a rush fee.

  • Construction drawings and proof of insurance will need to be provided as requested.

  • A City of Calgary work permit may also need to be provided, depending on the nature of the work.

Street Use Permit

A permit is required to host a booth, display, or activation on Stephen Avenue, including Stampede and seasonal displays. Permit fees are dependent on the size and purpose of your set up. Please allow 7-10 days for permit processing.

Stephen Avenue does NOT include the Olympic Plaza/Burns Building Block (200 8th Ave SE). Contact 3-1-1, or 403-268-2489 if you are outside Calgary, to request permits for this block.

Please note that consultation with our Street Operations Manager is required but not limited to:

  • Line queueing wait zones.

  • Setting up outdoor booths for your store.

  • Having tents or canopies on Stephen Avenue

  • Installation of all large décor items. Pre-approval is required to ensure we are managing traffic on Stephen Avenue. Your permit may be subject to a Calgary Fire code inspection.

Photography & Film Permits

Whether you are looking to Stephen Avenue or Barclay Parade for fashion photography, commercials, films, or television, all film and photography companies require a permit.

Film companies must be registered with the Calgary Film Commission and have been issued a permit from them to film. The Commission will reach out to CDA for a Stephen Avenue permit extension if required by your project.

Click here to apply for a photography/film permit with Calgary Film Commission.

All filming and photography must be scheduled to preserve the pedestrian experience and ensure access to businesses. If fees are incurred (e.g., for removal of Avenue infrastructure, removal of trees, cleaning, repair of damage, etc.) they will be billed to the filming company through Calgary Film Commission. Any revenue generated from fees is re-invested into enhancing the vitality and character of the streets. All businesses in the filming area should be notified by the filming company with a good neighbour letter and have had their permission obtained as needed.

 

Stephen Avenue

Seasonal

Patio Application

Calgary Downtown Association is pleased to be able to offer a seasonal patio program during the spring and summer months (April 1st to October 31st). Please allow a minimum of 10 business days for processing.